ACCESS TO BUILDING COMPLEX
There will be 4 access doors to enter the area be Epicentrum (The Wave)
Among Others:
1. Through its Main Line between Market and Festival Hospital. MMC Kuningan Jakarta
2. Through the point Nyi Ageng Macquarie Street, between Central Usmar Ismail film and The Next Project International Hospital.
3. Through the Empire Tower, Empire Puri
4. Through Jl. Casablanca, (next Access).
DATA PROJEK
Total Luas Area : 36.145,63 M2
Jumlah Tower : 9 Tower
- 3 Tower A (A1, A2, A3)
- 6 Tower B (B1, B2, B3, B5, B6, B7)
Phase Penjualan
Phase I:
- Tower A1: 168 Unit, A2 Stage 1: 134 Unit,
- Tower B7: 335 Unit, B6: 325 Unit, B5 335 Unit,
Phase II:
- Tower A3: 162 Unit, A2 Stage 2: 171 Unit ,
- Tower B3: 365 Unit, B2: 355 Unit, B1: 365 Unit
Jumlah Unit Phase I: 1.297 Unit
- Tower A: 302 Unit
- Tower B: 995 Unit
Total Unit Apartemen Phase I + Phase II : 2.715 Unit
Jumlah Tower : 9 Tower
- 3 Tower A (A1, A2, A3)
- 6 Tower B (B1, B2, B3, B5, B6, B7)
Phase Penjualan
Phase I:
- Tower A1: 168 Unit, A2 Stage 1: 134 Unit,
- Tower B7: 335 Unit, B6: 325 Unit, B5 335 Unit,
Phase II:
- Tower A3: 162 Unit, A2 Stage 2: 171 Unit ,
- Tower B3: 365 Unit, B2: 355 Unit, B1: 365 Unit
Jumlah Unit Phase I: 1.297 Unit
- Tower A: 302 Unit
- Tower B: 995 Unit
Total Unit Apartemen Phase I + Phase II : 2.715 Unit
DATA PROJEK 2
Jumlah Unit / Per Lantai
- Tower A3 Dan A1 : 6 Unit
- Tower A2 : +/- 20 Unit
- Tower B (All) : 10 Unit
Ketinggian Lantai
- A1: 35 Lt., A2: 19 Lt., A3: 35 Lt.
- B7: 40 Lt., B6: 41 Lt., B5: 42 Lt., B3: 43 Lt.,
B2: 44 Lt., B1: 45 Lt.
- Tower A3 Dan A1 : 6 Unit
- Tower A2 : +/- 20 Unit
- Tower B (All) : 10 Unit
Ketinggian Lantai
- A1: 35 Lt., A2: 19 Lt., A3: 35 Lt.
- B7: 40 Lt., B6: 41 Lt., B5: 42 Lt., B3: 43 Lt.,
B2: 44 Lt., B1: 45 Lt.
FLOOR PLAN MIDDLE A
FLOOR PLAN MIDDLE B
Kamis, 24 Juli 2008
SPESIFIKASI UNIT
SPESIFICATION STANDARD UNIT | |||
THE WAVE @ RASUNA EPICENTRUM | |||
MIDDLE A | MIDDLE B | ||
LANTAI, DINDING, & PLAFON | | | |
Lantai | Ruang Keluarga | Homogenous | Keramik |
| Ruang Makan | Homogenous | Keramik |
| Ruang Tidur | Homogenous | Keramik |
| Kamar Mandi | Keramik | Keramik |
| Balkon | Keramik | Keramik |
| | | |
Dinding | Antar Unit | Lightweight concrete | Lightweight concrete |
| Batas Koridor | Lightweight concrete | Lightweight concrete |
| Antar Ruang | Dry wall system | Dry wall system |
| Finishing | Cat Water Base | Cat Water Base |
| Finishing Luar Bangunan | Cat External | Cat External |
| | | |
Langit-langit | Ruang Keluarga | Exposed Finish cat | Exposed Finish cat |
| Ruang Makan | Exposed Finish cat | Exposed Finish cat |
| Ruang Tidur | Exposed Finish cat | Exposed Finish cat |
| Kamar Mandi | Kalsium Silikat di cat | Kalsium Silikat di cat |
| Balkon | Exposed finish cat | Exposed finish cat |
| | | |
PINTU & JENDELA | | | |
| | | |
Pintu | Luar | Pintu kayu finish melamik | Pintu kayu finish melamik |
| Dalam | Double Teakwood | Double Teakwood |
| Kamar Mandi | Double Teakwood -Melaminto | Double Teakwood -Melaminto |
| | | |
Jendela | | Aluminium Anodized | Aluminium Anodized |
| | Kaca | Kaca |
| | | |
LAIN-LAIN | | | |
| | | |
Listrik | Daya 1 BR | - | 3500 VA |
| Daya 2 BR | 4500 ~ 7700 VA (tergantung LB, 70 VA/m²) | 4500 VA |
| Daya 3 BR | 7700 VA | - |
| Daya Town House | 13200 VA ~ 16500 VA (tergantung LB, 70 VA/m²) | 11000 VA |
| Daya Ruko 2 lantai | 23000 VA ~ 41500 VA (tergantung LB, 115 VA/m²) | - |
| Daya Ruko 3 lantai | 33000 VA | - |
| | | |
| Instalasi Televisi | ada | ada |
| Instalasi Pipa & Power AC | ada | ada |
| Lampu, Saklar dan Stop Kontak | ada | ada |
| Instalasi Air Panas | ada | ada |
| | | |
Telepon | | 1 saluran | 1 saluran |
| | | |
Sanitair | Standart | Toto / Amstad / setara | Toto / Amstad / setara |
| | | |
Kitchen set | Built-in | Lokal (Sink & Lower - Upper Kitchen Cabinet) | Lokal (Sink & Lower Kitchen Cabinet) |
| | | |
PEMBAYARAN
Hard Cash
Diskon : 20%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Dibayarkan 4 Bulan
Dibayarkan 1 bulan setelah uang muka ke-3
Angsuran 12 Bulan
Diskon : 15%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur 10 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
Angsuran 24 Bulan
Diskon : 10%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur selama 22 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
Angsuran 30 Bulan
Diskon : 5%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur selama 28 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
Angsuran 36 Bulan
Diskon : 0%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur selama 34 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
KPA
Diskon : 5%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : KPA
Diskon : 20%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Dibayarkan 4 Bulan
Dibayarkan 1 bulan setelah uang muka ke-3
Angsuran 12 Bulan
Diskon : 15%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur 10 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
Angsuran 24 Bulan
Diskon : 10%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur selama 22 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
Angsuran 30 Bulan
Diskon : 5%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur selama 28 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
Angsuran 36 Bulan
Diskon : 0%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : Diangsur selama 34 Bulan
(Dibayarkan 1 bulan setelah uang muka ke-3)
KPA
Diskon : 5%
Booking Fee : 5 Jt
Uang Muka 20% : Diangsur 2 Bulan
Pelunasan 80% : KPA
SERAH TERIMA
PHASE I (A1=21, A2 Stage 1, B7, B6, B5)
JULY 2010
PHASE II (A3=19, A2 Stage 2, B3, B2, B1)
JULY 2012
JULY 2010
PHASE II (A3=19, A2 Stage 2, B3, B2, B1)
JULY 2012